Scheduled aerial orthomosaic mapping and ground capture on a repeating cadence to document construction progress, verify schedules, and update stakeholders.
Built for GCs Who Report to People Who Are Not on Site
General contractors, commercial developers, civil engineers, and project owners who need regular visual proof of construction site progress without putting boots in the mud every week.
Managing complex builds requires clear, indisputable visual evidence for bank inspections, owner updates, and subcontractor coordination.
◆General contractors providing visual updates to off site owners
◆Commercial developers verifying construction milestone progress
◆Civil engineering firms monitoring earthwork and utility install
◆Project managers documenting pre-slab and structural framing
02. WHAT YOU GET
What Gets Captured on Every Repeat Site Visit
Repeatable aerial waypoint photos and video passes captured from locked GPS coordinates
Measurable high-resolution aerial orthomosaic site maps for side-by-side progress tracking
Timestamped digital archives hosted in cloud folders for instant stakeholder access
File Formats
4K H.264 MP4, High resolution JPEG stills, GeoTIFF orthomosaic maps
Aspect Ratios
16:9 aerial overview, Top-down orthomosaic grid
Deliverable Scope
20 to 40 timestamped photos plus site flight video per visit
Turnaround Time
24 to 48 hours following site visit
03. HOW IT RUNS
GPS Waypoints Lock so the Months Line Up
We lock precise GPS coordinates and automated flight paths on day one. On every recurring visit (weekly, bi-weekly, or monthly), our drones fly identical waypoint paths to capture side-by-side visual comparisons over time.
We also walk interior milestone zones to document framing, mechanical, electrical, and plumbing installations before drywall enclosure.
01
GPS Waypoint Locking
We program automated drone waypoints and camera angles during the initial site visit.
02
Cadence Capture Visits
We fly the identical path at scheduled intervals to capture direct visual comparisons.
03
Interior Progress Walkthrough
We walk interior milestone zones to document mechanical, electrical, and plumbing progress.
04
Portal Upload & Archive
We index timestamped high-resolution photos and video loops in your project folder.
Client Preparation & Site Requirements
✓Provide jobsite address, site map boundaries, and safety site contacts
✓Notify site superintendent of scheduled drone flight visits
✓Identify specific milestone areas or underground trenching requiring focus
✓Provide active site access instructions or gate entry codes
05. WHY IT MATTERS
What a Missing Progress Record Costs You
Off-site stakeholders struggle to gauge progress from text status reports. Subcontractor disputes occur when historical site conditions are undocumented, and manual site walkthroughs take hours of project management time.
When disputes arise over slab pours, underground utility trenching, or weather delays, missing historical photos cost thousands. Driftline creates an automated visual archive of your site from ground breaking to handover.
Carlisle based, serving Cumberland, Dauphin, and York counties in Central Pennsylvania. FAA Part 107 certified remote pilot operations with 2M commercial liability insurance coverage.
06. QUESTIONS
Jobsite Progress Documentation Questions
07. HOW IT GETS QUOTED
How Jobsite Progress Documentation Gets Quoted
Priced per site visit or recurring monthly progress package.
Half Day Scope
Single site visit covers aerial waypoint photography, orthomosaic scan, and interior walk.
Full Day Scope
Multi site coverage or expansive civil infrastructure corridors across counties.
Key Scope Drivers
◆Frequency of recurring visits (weekly, bi-weekly, or monthly)
◆Acreage footprint of construction site requiring orthomosaic scanning
◆Need for detailed interior MEP walkthrough documentation
Two revision rounds included. Files delivered to a folder you own with unlimited commercial use. Every project quote is fixed in writing before we shoot.